References

LOTTE Infracell Hungary - Aluminum Foil Manufacturing Plant Phase 2

LOTTE Infracell Hungary - Aluminum Foil Manufacturing Plant Phase 2

Description:
The production hall and technological support buildings of the Korean LOTTE ALUMINIUM factory, which was built in the Tatabánya Industrial Park in 2021, were expanded with a capacity-increasing development. The approximately 22,000 m2 hall expansion has the same precast reinforced concrete and composite on-site concrete structure as the previous one, and the additional buildings were partly made with reinforced concrete and partly with steel frame structures. Two additional rolling mills were installed in the new two-story hall section. The general contractor of the project was TAKENAKA.
Location Year of completion Value (million HUF) (net) Abéta, as
Tatabánya Industrial Park – Környe 2024 7.500 million HUF technical supervisor

MAGNA Manufacturing Plant - Vecsés

MAGNA Manufacturing Plant - Vecsés

Description:
A new manufacturing facility was built on the outskirts of Vecsés, near the M0 motorway and the airport, as part of the WEERTS Logistic Parks (WLP) investment. The building has a total area of approximately 42,000 sq.m., with a prefabricated reinforced concrete frame structure. The manufacturing area is 37,500 sq.m., while the office and social spaces occupy 4,500 sq.m. The building consists of two sections with different heights, according to the requirements of the technology. The building, equipped with high-level mechanical and technological networks, will become the new site of the MAGNA Body & Chassis Hungary Kft. factory operating in the automotive industry.
Location Year of completion Value (million HUF) (net) Abéta, as
Vecsés – WLP 2024 9.600 million HUF technical supervisior and HSE coordinator

Kecskemét South Industrial Park - InfoGroup

Kecskemét South Industrial Park - InfoGroup

Description:
The new production hall of MOBIS Hungary Ltd., which produces automotive parts, was built in the second phase of InfoGroup's development in the area of Kecskemét South Industrial Park. The total built-up area is 14.600 m2, the production hall is 12.700 m2, while the supporting areas and office rooms occupy 1.900 m2. The building has a reinforced concrete frame, is insulated, heated, ventilated, air-conditioned in the office areas, equipped with fire alarms and sprinkler extinguishing systems. The general contractor of the project is PALLÉR Csarnok Ltd.
Location Year of completion Value (million HUF) (net) Abéta, as
Kecskemét 2024 1.600 mFt million HUF technical supervisor

GROUPAMA ARENA – installation of solar panels to the roof of the sport center

GROUPAMA ARENA – installation of solar panels to the roof of the sport center

Description:
1350 solar panels were placed on the top of the FTC's (leader club in Hungarian football championship) most important sports facility, the Groupama Arena located in Üllői street Budapest. The solar panels on the curved roof surface were placed so that the gaps between the panels show the inscription "FTC" to aircraft flying in the air corridor above the object.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest IX. district 2023 200 million HUF technical supervisor

DECORATION & DESIGN extension of storage hall

DECORATION & DESIGN extension of storage hall

Description:
Expanding the warehouse of the company, which sells flower binding and decorative products, is an insulated warehouse with 1600 m2, using a reinforced concrete structure. The storage in warehouse is done a „high shelf system”, so the floor flatness has a high precision.
Location Year of completion Value (million HUF) (net) Abéta, as
Szigetszentmikós 2023 190 million HUF technical supervisor

LOTTE CHEMICALS expansion of the production and storage hall with an office block

LOTTE CHEMICALS expansion of the production and storage hall with an office block

Description:
The expansion of the production hall of the LOTTE Chemicals factory building (built in phase II.) in the Tatabánya Industrial Park with a new production and storage hall with a reinforced concrete skeleton. A steel support structure was also established inside the building for the plant technology. The ground-floor wing attached to the building houses offices and a social block. The total built-up area is 2580 m2.
Location Year of completion Value (million HUF) (net) Abéta, as
Környe 2023 1200 million HUF technical supervisor

Construction of a new production hall for GIANT by TOBROCO

Construction of a new production hall for GIANT by TOBROCO

Description:
The Dutch-owned company that manufactures parts for heavy machinery has moved its site from Eger to Füzesabony. The new, green field investment is one of the first projects of the Füzesabony Industrial Park. The production hall with a reinforced concrete frame has a floor area of 8,000 m2, including a 1,500 m2, two-storey office and social block. The air handling system that supplies the entire production hall provides tempered temperatures in all seasons. Energy efficiency is supported by the small solar power plant installed on the roof. The project includes complete utilities and the construction of a new road plus parking lot, as well as gardening works.
Location Year of completion Value (million HUF) (net) Abéta, as
Füzesabony 2022 1700 million HUF technical supervisor

SANGSIN factory expansion

SANGSIN factory expansion

Description:
The Korean SANGSIN Hungary Ltd. expanded its production hall in Jászberény with two building blocks with a total floor area of approximately 4,100 m2. In one of them, production lines and service technologies were installed to expand production capacity, and in the other, an automated warehousing system was built. Both blocks are thermally insulated hall structures with a reinforced concrete skeleton, the mechanical and electrical systems of which have been implemented by expanding the existing networks. The warehouse expansion received a sprinkler extinguishing system.
Location Year of completion Value (million HUF) (net) Abéta, as
Jászberény 2022 1700 million HUF technical supervisor

Construction of a new high-bay warehouse for TRANS-SPED

Construction of a new high-bay warehouse for TRANS-SPED

Description:
A new, 6700 m2 reinforced concrete high-bay warehouse was built on the logistics base of Trans-Sped Ltd., which opened in 2016. The design for an automated, high-shelf warehouse required an extremely flat-precision, sanded industrial floor structure to meet the challenges of the rapidly evolving warehousing technology. The fire safety of the building and the stored products are ensured by an aspiration fire alarm and sprinkler extinguishing system. The building was also equipped with the office and social space required for operation.
Location Year of completion Value (million HUF) (net) Abéta, as
Környe 2022 1900 million HUF technical supervisor

The reconstruction of the new building of the Hungarian National Bank

The reconstruction of the new building of the Hungarian National Bank

Description:
Reconstruction of the building of the former TELEKOM headquarters on Krisztina Boulevard in the 1st district of Budapest in accordance with the unique needs of the Hungarian National Bank (MNB) and the Budapest Stock Exchange (BÉT). The 20,000 m2 main building consists of four blocks, have 5-storeys and partial basement, and is complemented by a restaurant block and a multi-storey underground garage. The imposing roof covered atrium of the main building opens onto a spacious conference room with state-of-the-art audio and video equipment. The designer of the reconstruction was prepared by V4R Ltd., the main contractor of the reconstruction was RAW Development Ltd.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest, 1st district 2022 2022 15 000 million HUF technical supervisor

Reconstructionof the 3rd floor of The Constitutional Court of Hungary

Reconstructionof the 3rd floor of The Constitutional Court of Hungary

Client: The Constitutional Court of Hungary

Description:
The 3rd floor of the building has been completely rebuilt. Following the complete demolition of the internal masonry, cladding, and mechanical and electrical wiring, a new, modern kitchen, restaurant and café were built. A new multifunctional meeting and conference room with state-of-the-art audiovisual equipment and customizable furniture have also been established. Moreover, a new and modern three-room office block was built on the floor. The plans were designed by GINGKO Architects.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest 1st district 2021 530 million HUF technical supervisor

LOTTE aluminium foil factory

LOTTE aluminium foil factory

Client: LOTTE Aluminium Hungary Ltd.

Description:
As a Korean greenfield investment, a 16,000 sqm factory producing aluminum foil for battery production was established. SAMSUNG Engineering was the general contractor for the complete unit of the prefabricated and on-site reinforced concrete frame, two-story manufacturing and warehousing hall, as well as the separate office block and other buildings, structures, roads, and parking lots.
Location Year of completion Value (million HUF) (net) Abéta, as
Környe, the industrial park of Tatabánya 2021 6500 million HUF technical supervisor

Construction of NOVOPOLMA warehouse and office building

Construction of NOVOPOLMA warehouse and office building

Client: NOVOPOLMA Ltd.

Description:
A new warehouse and an office building have been established for the auto parts trading company. The supporting structure of the warehouse building is a set of steel lattice girders resting on reinforced concrete pillars, while the two-storey main building is made of classic reinforced concrete frames with infill brick masonry. The main building contains offices with sophisticated interior design and a sales area for the public.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest, 20th district 2021 500 million HUF technical supervisor

CHURCH OF TOGETHERNESS (MAKOVECZ)

CHURCH OF TOGETHERNESS (MAKOVECZ)

Description:
The draft plans of the Protestant Church in Mátyás király square in Pesterzsébet were made by the Kossuth and Ybl award-winning architect, Imre Makovecz shortly before his death. The permitting and construction plans of the building, which consists of the church itself, a congregation hall and a vicarage, were prepared by architect Tamás Dósa-Papp. The reinforced concrete and brick walls of the building support a multi-curved, glue-laminated timber (GLT) structure that rests on the loadbearing walls.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest, 20th district 2021 730 million HUF construction manager and technical supervisor

XL warehouse

XL warehouse

Client: M0-M31 Logistic Center Ltd.

Description:
A new, 35,000 m2 reinforced concrete warehouse was built in the industrial park of Nagytarcsa. The warehouse and the internal two-storey office space will be utilized by the investor through leasing. The contractor is GOLDBECK Ltd.
Location Year of completion Value (million HUF) (net) Abéta, as
Nagytarcsa 2021 8800 million HUF technical supervisor

DANIELLA warehouse and office building

DANIELLA warehouse and office building

Client: DANIELLE Ltd.

Description:
A new, 12,000 m2 reinforced concrete logistics center has been established in the Nagytarcsa Industrial Park as the center of the wholesale activity of DANIELLA Ltd. The high-bay warehouse is complemented by a two-story office and social block. The contractor is GOLBECK Ltd.
Location Year of completion Value (million HUF) (net) Abéta, as
Nagytarcsa 2020 3200 million HUF technical supervisor

Energy renovation of the building of The Constitutional Court of Hungary

Energy renovation of the building of The Constitutional Court of Hungary

Client: The Constitutional Court of Hungary

Description:
Subsequent insulation of the facades of the building and replacement of the windows and doors of the front with the installation of external motorized blinds. The complete technical supervision tasks and the implementation of the renovation were performed by ABÉTA Ltd.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest, 1st district 2020 920 million HUF construction management and technical supervisor

Renovation of a downtown residential building with attic conversion

Renovation of a downtown residential building with attic conversion

Client: Basilica Residence Ltd.

Description:
Construction of 11 new, partly two-storey apartments in an attic-ground floor- 3-storey, classicist-style residential building in the middle of the Sas Street in the city center. Moreover, the renovation of the roof, the external and internal facades of the building, the staircase, the hanging corridors, the mechanical and electrical network and the installation of a new elevator. The complete technical supervision of the construction works, which lasted for almost two years, was performed by ABÉTA Ltd.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest, 5th district 2020 620 million HUF technical supervisor

Vörösmarty sculpture preservation and exhibition pavilion

Vörösmarty sculpture preservation and exhibition pavilion

Client: Budapest Festival and Tourism Center (BFTK)

Description:
The naming statue of Vörösmarty Square, one of the most visited squares in central Budapest, is wrapped in foil every autumn due to the unfavorable effects of the winter weather. This was substituted in 2019 by the construction of a temporary conservation and show/display pavilion planned for this location. The pavilion was rebuilt in the fall and served as a decoration for the Christmas market. In the spring, it was picked apart and transported to a storehouse until next fall. Both the construction and dismantling works were supervised by ABÉTA Ltd. as a technical supervisor.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest, 5th district 2020 - technical supervisor

DOOSAN copper foil factory - Környe, Industrial Park of Tatabánya

DOOSAN copper foil factory - Környe, Industrial Park of Tatabánya

Client: DOOSAN Energy Solution Ltd.

Description:
The plant, which is a Korean investment is about 32,000 m2 and produces copper foil for the production of batteries. The greenfield investment included reinforced concrete and steel skeleton industrial halls, a two-story office building, technology buildings and structures, as well as a 132/20 kV electrical receiving and transformer station, an internal utility and a road network, all of which was completely supervised by ABÉTA Ltd. in about 15 months.
Location Year of completion Value (million HUF) (net) Abéta, as
Környe 2020 14000 million HUF technical supervisor

Complete renovation of the FTC football fields

Complete renovation of the FTC football fields

Client: Ferencvárosi Torna Club, a professional football club based in Ferencváros, Budapest

Description:
During the complete renovation of the 3 standard size grass training fields located in FTC Népliget Sports Center the beds went under a complete replacement and a track heating and irrigation system was installed. Plastic fibers were threaded into the lawn mat to achieve adequate mechanical resistance. In order to achieve an impeccable quality of grass covered play area, a grow lighting equipment was also installed. The renovation was carried out under the technical supervision of ABÉTA Ltd.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest, 10th district 2019 4000 million HUF technical supervisor

Construction of a new fiber extraction plant, waste starch building and boiler house in Dunaföldvár

Construction of a new fiber extraction plant, waste starch building and boiler house in Dunaföldvár

Client: Pannonia Bio Plc. (Ireland)

Description:
In the area of the Dunaföldvár plant of the corn processing chemical plant, we performed the technical supervision of the implementation of three new technological buildings. We cooperated with the construction of a 4-storey reinforced concrete skeleton fiber extraction plant, the construction of a waste starch utilizing reinforced concrete skeleton building and the installation of a steel skeleton boiler building.
Location Year of completion Value (million HUF) (net) Abéta, as
Dunaföldvár 2019 780 million HUF technical supervisor

Construction of a new production hall, office building and social block - Perbál

Construction of a new production hall, office building and social block - Perbál

Client: ARH Hungária Plc.

Description:
At the developer's site in Perbal, in the next phase of development, a prefabricated reinforced concrete skeleton hall "D" was built on the two complete floors on a total of about 2,400 m2. The two-storey office and social block is located in the main section of the hall. The entire building, including the production areas, is air-conditioned. The complete technical supervision tasks of the implementation were performed by ABÉTA Kft.
Location Year of completion Value (million HUF) (net) Abéta, as
Perbál 2019 540 million HUF technical supervisor

Construction of a new production hall, warehouse and office building - Nagytarcsa

Construction of a new production hall, warehouse and office building - Nagytarcsa

Client: KUHMICHEL Abraziv Ltd. (Germany)

Description:
As a greenfield investment, full technical supervision of the construction of a lightweight hall with a steel frame structure of 1100 m2 in the Nagytarcsa Industrial Park.
Location Year of completion Value (million HUF) (net) Abéta, as
Industrial Park of Nagytarcsa 2019 320 million HUF technical supervisior

Construction of a new chemical factory in Komárom

Construction of a new chemical factory in Komárom

Client: JWH Ltd.

Description:
Complete technical supervision of the greenfield construction of a new chemical factory in the Industrial Park of Komárom. The factory has a 600m2 r.c. skeleton office building, a 1300m2 steel skeleton technological building and a circa 7000m2 open-air production area. On the plant site 9 big carbon-steel and and stainless-steel tanks had been installed, among which the largest are over 1000m3.
Location Year of completion Value (million HUF) (net) Abéta, as
Industrial Park of Komárom 2019 1600 million HUF technical supervisor

New apartment complex in Dolmány street

New apartment complex in Dolmány street

Client: LÖVALEX GROUP Ltd.

Description:
Complete technical supervision of a new apartment complex with 36 flats (groundfloor + 4 floors) in the 13th district, Budapest. The building has reinforced concreteskeleton and brick filler walls. It also has and underground garage and inner garden.
Location Year of completion Value (million HUF) (net) Abéta, as
40 Dolmány Street, Budapest, 13th district 2018 1100 million HUF technical supervisor

PENDULA NURSERY-SCHOOL

PENDULA NURSERY-SCHOOL

Client: VILÁGSZÉP Foundation

Description:
Reconstruction of a mansion with a garden to create a nursery-school and a youth center in the 2nd district, Budapest. The building hosts 3 nursery groups, the administrative offices of the foundation and community space for youth aged 8-18 (learning kitchen, gym). The park surrounding the building had been rehabilitated as well.
Location Year of completion Value (million HUF) (net) Abéta, as
18 Hűvösvölgyi Street, Budapest, 2nd district 2018 650 million HUF technical supervisor

NEBU-CHEM warehouse and office building

NEBU-CHEM warehouse and office building

Client: NEBU-CHEM Ltd.

Description:
Complete technical supervision of the greenfield construction of a 1050m2 warehouse and an office building in the Industrial Park of Kistarcsa. The building has reinforced concreteskeleton, sandwich-structured walls, insulated PVC sheeted roof, internal RC slabs, industrial floors, complete electrical and mechanical network and a parking lot.
Location Year of completion Value (million HUF) (net) Abéta, as
Industrial Park of Kistarcsa 2018 340 million HUF technical supervisor

Energy efficiency improvement of FTC Elek Gyula Handball Arena

Energy efficiency improvement of FTC Elek Gyula Handball Arena

Client: Magyar Nemzeti Vagyonkezelő Pcl.

Description:
Technical supervision of the complete energy efficiency improvement of Ferencvárosi Torna Club's handball arena, located in Népliget Sportcentrum. The renovated building now has a new, insulated roof, sandwich-structured walls and dryvit-type insulation. All doors and windows had been replaced and the building's boiler house was fully modernised.
Location Year of completion Value (million HUF) (net) Abéta, as
47/A Kőbányai Street, Budapest, 10th district 2018 700 million HUF technical supervisor

Construction of AGC's warehouse expansion

Construction of AGC's warehouse expansion

Client: AGC Glass Hungarys Ltd.

Description:
Extensive technical supervision and project management of a new, 3200 m2 warehouse expension. Client, AGC Glass Hungary Ltd. is located in the Industrial Park of Tatabánya and is a company specializing in glass manufacturing for the automotive industry.
Location Year of completion Value (million HUF) (net) Abéta, as
Industrial Park of Tatabánya, Környe 2018 2018 550 million HUF project manager, technical supervisor

Implementation of new production hall for LOTTE AM. Hungary

Implementation of new production hall for LOTTE AM. Hungary

Client: LOTTE Advanced Materials Hungary LLC.

Description:
Complete technical supervision of a new 9.900 m2 production hall in Környe for the 8th largest South Korean company group next to its existing plant. The second factory of LOTTE Advanced Materials Hungary LLC. which especially produces plastic granules in Hungrary was implemented as a greenfield investment. The production hall was executed by LAKÓGÉP Ltd. in less than 5 months. During construction the exemplary building organization has greatly contributed to the completion of high quality construction and record time.
Location Year of completion Value (million HUF) (net) Abéta, as
Industrial Park of Tatabánya, Környe 2017 1700 million HUF technical supervisor

Renovation and insulation of József Attila Theater's elevation

Renovation and insulation of József Attila Theater's elevation

Client: József Attila Színház Nonprofit Ltf.

Description:
Insulating works and design elevation for theater going under energy efficiency modernization, located in the 13th district, Budapest. In parallel with the theater's renovation, a new cafe had opened by the theater's main entrance. Our job was the technical supervision of the construction works.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest, 13th district 2017 2017 85 million HUF technical

New warehouse and office building

New warehouse and office building

Client: Skorpió Póló Ingatlan Ltd.

Description:
Extensive technical supervision of a new 2000 m2 warehouse and a 700 m2 office building construction in the Industrial Park of Újpest. Warehouse has reinforced concrete structure, plastic doors and windows, the facade is insulated with sandwich boards, clear height is 12m. It was built with every necessary electrical and mechanical building service system. Office building has 3 floors.
Location Year of completion Value (million HUF) (net) Abéta, as
Industrial Park of Újpest, Budapest 4th district 2018 2018 420 million HUF technical supervisor

Implementation of Budapest Bábszínház Kemény Henrik Room

Implementation of Budapest Bábszínház Kemény Henrik Room

Client: BUDAPEST BÁBSZÍNHÁZ NONPROFIT Ltd.

Description:
Technical supervision of the refurbishment works and giving new function for BUDAPEST BÁBSZÍNHÁZ NONPROFIT Ltd.'s rooms located on Budapest VI. district. Vörösmarty street 31. The teathre's purpose was to have a new play and rehaersal room available for 50 people which is named after Henrik Kemény, (famous hungarian puppet actor). The design works were made by ART'O'DOM Ltd.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest VI. district 2017 45 million HUF technical supervisor

Refurbisment works of FERENCVÁROSI TORNA CLUB swimming pool hall and dressing rooms

Refurbisment works of FERENCVÁROSI TORNA CLUB swimming pool hall and dressing rooms

Client: FERENCVÁROSI TORNA CLUB

Description:
Technical supervision of the refurbisment works of FERENCVÁROSI TORNA CLUB swimming pool hall and central dressing rooms and also corridors.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest X. district 2017 300 million HUF technical supervisor

Implementation of Perbál "C" storage hall

Implementation of Perbál "C" storage hall

Client: Ipari Bázis Fejlesztő és Kezelő Ltd.

Description:
Implementation of a 840 m2 storage hall realized in greenfield investment. The construction of the "C" hall is part of further developments of the premises in addition to the existing hall buildings. Inside the storage-function hall also offices have been realized.
Location Year of completion Value (million HUF) (net) Abéta, as
Perbál 2017 160 million HUF technical supervisor

Implementation of Ecseri Ltd. new production hall and relating office builing and social block.

Implementation of Ecseri Ltd. new production hall and relating office builing and social block.

Client: Ecseri Ltd.

Description:
For Ecseri Ltd. realized a new prefabricated reinforced concrete framed, 9 and 6.8 meters clear high, three naves craned, 23.000 m2 production hall, two-storey office and social block building complex as a greenfield investment. "Big-slab" industrial floor constructed through the whole production hall. The two-storey office block elevation has unique look of ceramic cladding, which in addition to its attractive appearance has beneficial effects to the summer balance of heat as well. There are provided more than 60 car parking spaces in the property and considerable covered bicycle storage. Other reinforced concrete structures built also, such as fire water tank and technology waste storage. A steel structured reception building gets the arrivals. The completely Hungarian company's main profile is production and processing of aluminum castings. Product range typically contains components of the car-, engineering- and electrical industry produced by aluminium pressed die-casting technology. As a result of the investment 250 new workers can be employed.
Location Year of completion Value (million HUF) (net) Abéta, as
Cegléd, Industrial Park 2017 2500 million HUF technical supervisor

New storage hall and office building for Trans-Sped Ltd.

New storage hall and office building for Trans-Sped Ltd.

Client: Trans-Sped Ltd.

Description:
Complete technical supervision of implementation of a new 6.000 m2 stoarge hall and relating office block for the forwarding and transporting Trans-Sped Ltd. The nearly 1 billion forint greenfield investment was built less than one year in Tatabánya-Környe Industrial Park.
Location Year of completion Value (million HUF) (net) Abéta, as
Környe 2016 800 million HUF technical supervisor

Implementation of 2nd phase of Eurochamp Ltd. new growing hall

Implementation of 2nd phase of Eurochamp Ltd. new growing hall

Client: Eurochamp Ltd.

Description:
Complete technical supervision of implementation of new "mushroom houses" for the mushroom growing Eurochamp Ltd. Significant mechanical investment realized in the mushroom houses relating to the growing technology.
Location Year of completion Value (million HUF) (net) Abéta, as
Ócsa 2016 250 million HUF technical supervisor

Lobby reconstruction works of CENTRAL THEATRE

Lobby reconstruction works of CENTRAL THEATRE

Client: CENTRAL THEATRE Nonprofit Ltd.

Description:
Client’s main purpose was to get a modern interior image by the renewal works of the lobby and entrance-hall of the minor stage in the Révay Street. Because of the new intention - to form complete and large space - the existing slab was demolished in the two-storied gallery during the implementation. The construction which was located in a busy city area became ready by a strict schedule where continous cooperation was necessary with the Project Members. The result speaks for itself: new high quality lobby is waiting for the audience.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest VI. district 2016 ~100 million HUF technical supervisor

Implementation of DUNA VITEX Ltd. new production and storage hall

Implementation of DUNA VITEX Ltd. new production and storage hall

Client: DUNA VITEX Ltd.

Description:
During the new plant expansion project of DUNA VITEX Ltd., a new reinforced concrete and steel mix-structural production hall of 4000m2 was implemented with the connecting internal roads, parking lots, gardening works and smaller additional operational buildings.
Location Year of completion Value (million HUF) (net) Abéta, as
XXII. district of Budapest 2016 800 million HUF project manager and technical supervisor

VOLÁN NÉPLIGET Traveller Centre and Ceiling Restoration

VOLÁN NÉPLIGET Traveller Centre and Ceiling Restoration

Client: VOLÁNBUSZ Co. Ltd.

Description:
Through the project of the ground floor of the Volánbusz Népliget bus station has been constructed a new Traveller Centre. In parallel the total replacement of the suspended false ceiling was implemented with mechanical equipment replacements and renovation of electrical systems.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest, Népliget 2016 100 million HUF technical supervisor

MOSAIK SPACE startup office reconstruction

MOSAIK SPACE startup office reconstruction

Client: FIEDLER-CAPITAL Hungray Co. Ltd.

Description:
The reconstruction is placed on the No. 32. Pannonia Street in XIX district, Budapest in an eclectic building from the beginning of the 19th century. The property had a full of modern interior design and renovation of electrical and a pleasant, well-appointed "startup" office was carried out. The two-story, approximately 800m2 floor space have independent office spaces, community and lecture spaces, meeting rooms, internal courtyard and a well-separated apartment also available.
Location Year of completion Value (million HUF) (net) Abéta, as
XIII. district of Budapest 2016 85 million HUF technical supervisor

Main entrance and management rooms renovation of the Örkény István Theatre

Main entrance and management rooms renovation of the Örkény István Theatre

Client: Örkény István Theatre Nonprofit Ltd.

Description:
Complete technical supervision of the renovation works of the main entrance and management spaces in the Örkény István Theatre. During the implementation all of the internal rooms gained a new architectural design. Architect designer of the renovation works was Krisztián Vincze (Art’O-Dom)
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest VII. 2015 37,5 million HUF technical supervisor

New production and storage hall

New production and storage hall

Client: PEX Automotive Systems Ltd.

Description:
Complete technical supervision of a new 2100 sm storage hall, social block and two-storey office building. The implementation took place at the premises of PEX Automotive Ltd. part of the PRETTL GROUP manufacturing microelectronic devices. The project was supported by the EU.
Location Year of completion Value (million HUF) (net) Abéta, as
Érd 2015 420 million HUF technical supervisor

Implementation of Production hall extension

Implementation of Production hall extension

Client: PLASTIMAT Magyarország Kft.

Description:
In Esztergom Industrial Zone, for Plastimat Hungary Ltd. which produces plastic car parts, fulfilling technical supervision of implementation of the new 1200sm production hall. The project was supported by the EU.
Location Year of completion Value (million HUF) (net) Abéta, as
Esztergom 2015 250 million HUF project manager and technical supervisor

Hungarian Folk Art Museum, Art Workshop and Office

Hungarian Folk Art Museum, Art Workshop and Office

Client: Hungarian Heritage House

Description:
Fulfilling technical supervision next to the existing Hungarian Folk Art Museum exhibition rooms, implementation of a duplex Art Workshop and office building.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest I. 2015 30 million HUF technical supervisor

Busch Hungary Ltd.. production technology expansion

Busch Hungary Ltd.. production technology expansion

Client: Busch Hungária Kft.

Description:
Technical supervision of works in Győr, Busch Hungaria Ltd. factory related to technological expanisons and developments.
Location Year of completion Value (million HUF) (net) Abéta, as
Győr 2014 1600 million HUF technical supervisor

Implementation of Production hall

Implementation of Production hall

Client: AGC GLASS HUNGARY Kft.

Description:
In Tatabánya Industrial Zone,for AGC Glass Hungary KFt which produce special glass structures for the car industy, managing and fulfilling technical supervision of implementation of the new, 8000 sm production hall and an office area inside the hall. The project was supported by the EU.
Location Year of completion Value (million HUF) (net) Abéta, as
Tatabánya Ipari Park, Környe 2014 1400 million HUF project manager and technical supervisor

Implementation of Open-air Stage on Margaret Island, phase III

Implementation of Open-air Stage on Margaret Island, phase III

Client: SZABAD TÉR Nonprofit Kft.

Description:
At Margaret Island, managing and technical supervising of the renovation and building of existing and new dressing rooms.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest 2014 96 million HUF project manager and technical supervisor

Pesti Theatre auditorium and waterblock reconstruction

Pesti Theatre auditorium and waterblock reconstruction

Client: Vígszínház Nonprofit Kft.

Description:
The exchange of the carpet and interior redisign of materilas and covers at the area of the Pest Theatre’s auditorium. At the same time high quality reconstruction of the waterblocks. During the reconstructions ABÉTA Kft was responsible for technical supervising.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest 2014 27 million HUF technical supervisor

TEVA Pharmaceutical Company and Lab

TEVA Pharmaceutical Company and Lab

Client: STOKPLAN Kft.

Description:
At TEVA’s settlement in Gödöllő, managing the contracting of a newly built, two-storey lab house, with special sterilized areas from tendering to technical take over hand over procedure. At the same time technical supervising at every fields.
Location Year of completion Value (million HUF) (net) Abéta, as
Gödöllő 2014 170 million HUF technical supervisor

Margaret Island Open-air Stage and Water tower renewal

Margaret Island Open-air Stage and Water tower renewal

Description:
Technical supervision of Margaret Island Open-air Stage and the historic preservation Water Tower renewal. The stage acquired a new, larger canopy cover streched on a greater span steel frame. The 2700 seats of auditorium were exchanged, and the synthetic resin was renewed on the auditorium floor. The toilettes were modernized, and the storage of the water tower was renovated. The reinforced concrete structure of the Water Tower was one of the first built in Hungary. After the needed structural renovations and conservations, the water tower got a new color of paint and floodlight.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest Margitsziget 2013 320 million HUF technical supervisor

Implementation of „Varázskert” day nursery

Implementation of „Varázskert” day nursery

Client: Local goverment of Budapest Ferencváros

Description:
Complete supervison of an up-to-date nursery with 40 children holding capacity in IX. district of Budapest. The project was supported by EU.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest IX. 2013 350 million HUF technical supervisor

DUNA VITEX office and storage hall expansion

DUNA VITEX office and storage hall expansion

Description:
Complete technical supervision of the implementation of a three-leveled office and storage hall, owned by a german abradant producer company, located in XX. district of Budapest.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest XX. 2013 140 million HUF technical supervisor

Demolition of power plant furnace blocks

Demolition of power plant furnace blocks

Description:
At the power plant of Százhalombatta Dunamenti Erőmű, technical supervision of the demolition of out of order furnace blocks. Built in the 1950’s, the gas heating power plant blocks were insulated with asbestos. That is why the demolition of the plants requires high and special technical and environmental safety by the implementation of an english company, Brown and Mason.
Location Year of completion Value (million HUF) (net) Abéta, as
Százhalombatta 2013 - technical supervisor

Renewal of the portal of Pesti Színház

Renewal of the portal of Pesti Színház

Description:
Renewal of the portal of Pesti Színház, located on Váci street in Budapest.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest V. 2013 7 million HUF technical supervisor

Solar installation for Vígszínház

Solar installation for Vígszínház

Description:
Technical supervision of the solar and electrical system installation to the top of tarnished building of Vígszínház.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest XIII. 2013 24 million HUF technical supervisor

Implementation of storage hall

Implementation of storage hall

Description:
Complete technical supervision of a greenfield implemetation in the industrial zone of Kunszentmárton on 4500 m2, a lightweight steel structure.
Location Year of completion Value (million HUF) (net) Abéta, as
Kunszentmárton 2013 380 million HUF technical supervisor

Implementation of Production hall and office building

Implementation of Production hall and office building

Description:
In the industrial zone of Piliscsaba, for the industrial knives producer, EUROKNIFE Bt., managing and fulfilling technical supervision about implementation of crane manufacturing hall, two-leveled office building and storage. The project were carried out by supportion of EU. In the first step building the prefabricated reinforced concrete frame, and later the office and storage were built.
Location Year of completion Value (million HUF) (net) Abéta, as
Piliscsaba 2013 320 million HUF project manager and technical supervisor

Building renovation of the Mayoral Office

Building renovation of the Mayoral Office

Client: Local Government of Perbál

Description:
Energy saving renovation of the single-storey building of the Mayoral Office. Heat insulation of all elevations and on the floor slab in the attic. Changing all doors and windows outside, installation of heat pump system. Project was supported by EU.
Location Year of completion Value (million HUF) (net) Abéta, as
Perbál 2011 44 million HUF technical supervisor

Interior reconstruction of Theatre Radnóti

Interior reconstruction of Theatre Radnóti

Client: Theatre Radnóti

Description:
General interior and electric reconstruction of the auditorium, artist reception, sound and light controlling, interior staircase of the theatre. Partial renovation of the lobby. It will be realized in the summer break.
Location Year of completion Value (million HUF) (net) Abéta, as
Budapest, VI. 2011 80 million HUF technical supervisor

MÁK BISTRO RESTRUCTURING

MÁK BISTRO RESTRUCTURING

Description:
Restructuring of the previous Restaurant Lou Lou in the city of Budapest. Completion of interior design, sanitary engineering and electric construction works due to the full change of interior design.
Location Year of completion Value (million HUF) (net) Abéta, as
Bp. V. 2010 18,0 million HUF main contractor

OFFICE BUILDING AND STORAGE HALL

OFFICE BUILDING AND STORAGE HALL

Description:
Project management and technical supervision of a two-storey high store with prefabricated reinforced- concrete frame structure and a four-storey office building, 8800 square meters (94,700 square feet in total). Realization of the project started in September, 2009.
Location Year of completion Value (million HUF) (net) Abéta, as
Bp. IX. 2010 1 100,0 million HUF project manager and technical supervisor

OFFICE BUILDING AND STORAGE HALL

OFFICE BUILDING AND STORAGE HALL

Description:
Project management and technical supervision of the implementation of the office building of 450 square meters (4840 square feet) with monolithic reinforced-concrete structure, infill brickworks, lightweight steel roof structure, and of an insulated lightweight structure steel storage hall of 300 square meters (3230 square feet). The realization of the project was sponsored by the EU.
Location Year of completion Value (million HUF) (net) Abéta, as
NAGYTARCSA 2010 148,0 million HUF project manager and technical supervisor

STORAGE HALL AND OFFICE BUILDING

STORAGE HALL AND OFFICE BUILDING

Description:
General technical supervision of the greenfield investment of a lightweight structured steel framed, insulated storage building of 1050 square meters (11,300 square feet), and a three-storey office building with monolith reinforced-concrete frame structure: construction, electric networks , mechanical building service, external public utilities and road construction.
Location Year of completion Value (million HUF) (net) Abéta, as
Bp. XVII 2009 152,0 million HUF technical supervisor

LOGISTICAL CENTER

LOGISTICAL CENTER

Description:
Storage and office building. Heat-insulated logistical hall of prefabricated reinforced-concrete frame, 15,000 square meters (161,500 square feet) of area and an office building with 1000 m2 built-in area. General technical supervision of the greenfield investment: construction, electric networks, mechanical building service, external public utilities and road construction.
Location Year of completion Value (million HUF) (net) Abéta, as
DUNAKESZI 2009 1500,0 million HUF technical supervisor

COVERED RIDING HALLS

COVERED RIDING HALLS

Description:
Implementation of two covered riding halls within the manege plant in Perbál, of an area of 1400 square meters (15,000 square feet) in total. Wooden structure of roof-trusses of 22 meters (72 feet) span on reinforced-concrete pillar and with tile roofing, roof light windows, brick infill walling, plaster rendering outside, emulsion paint inside.
Location Year of completion Value (million HUF) (net) Abéta, as
PERBÁL 2009 80,2 million HUF main contractor

STORAGE HALL AND OFFICE BUILDING

STORAGE HALL AND OFFICE BUILDING

Description:
Realization of the implementation and technical supervision of the implementation of the connected field-works (public utility- road construction, and gardening) of an heat-insulated storage hall of 2400 square meters (25,800 square feet) with prefabricated reinforced concrete framing, and the two-storey office building of 810 square meters (8,700 square feet) with traditional brick masonry and monolith reinforced-concrete structure.
Location Year of completion Value (million HUF) (net) Abéta, as
SZIGETSZENTMIKLÓS 2008 420,0 million HUF project manager and technical supervisor

WASTE TRANSFERRING STATION

WASTE TRANSFERRING STATION

Description:
Earthworks of great volume (6000 cubic meters, i.e. 211,888 cubic feet) on a building area on a wooded territory, milled asphalt and concrete pavement with steel hair reinforcement, reinforced-concrete technological structures, mine-shafts, steel covering structures, spatial lighting, public utility supply, landscaping, and construction of fence.
Location Year of completion Value (million HUF) (net) Abéta, as
VÁCRÁTÓT 2007 67,4 million HUF main contractor

STORAGE HALL AND OFFICE BUILDING

STORAGE HALL AND OFFICE BUILDING

Description:
Heat-insulated storage hall of 650 square meters (7000 square feet) of floor area with prefabricated reinforced-concrete framing, steel hair reinforced industrial floor, multi-storied storage shelf system and cold-storage rooms. Two-storey furnished office building of 350 square meters (3760 square feet) of total area with traditional masonry brick structure providing for office and social functions.
Location Year of completion Value (million HUF) (net) Abéta, as
BP. XVII 2006 171,4 million HUF main contractor

WASTE RECYCLING HALL

WASTE RECYCLING HALL

Description:
Light weight steel hall of 1100 square meters (11,840 square feet) with uninsulated trapezoid sheet walls and roof cover and openable roof fanlights. Steel hair reinforced industrial floor, reinforced-concrete shafts and base-plates, monolith reinforced-concrete firewater storage. mechanical building service electric networks and fire-alarm systems.
Location Year of completion Value (million HUF) (net) Abéta, as
GYÁL 2005 75 million HUF main contractor